First Treatment Plant Contaminated Water

The plant is designed to treat 60,000,000 m 3 / day of plant discharges within the industrial zone. Where the number of factories currently producing about 150 factories for different products as well as the State's plan to revive the faltering factories and qualify for entry into production in addition to the number of 118 plants enter the project into operation next year through the General Authority for Industrial Development

The station will be built in two phases

The first stage : absorbs about 35000 thousand / m 3 per day

The second phase : absorbs about 25 thousand / m 3 per day Cost of about three billion Egyptian pounds

On the area of the land owned by the company in a manner of purchase and allocation by the province of Port Said and estimated at about 56000 m 2 in addition to another area estimated at about 5000 m purchased by the General Authority for Industrial Development for the establishment of lifting station No. 3 "to serve the industrial sewage treatment plant. The equipment and machinery used will be manufactured through European countries, especially the Netherlands .

The Project Of establishing West Port Said Station

The aim of the plant is to treat the water of 10,000 m3 / day produced by the oil sector companies in the area around the station, in particular the Pharaonic company, Al-Wastani, Petrobal and other neighboring companies in different stations.

The station will be built in two stages

The first phase : can accommodate about 2000 m3 / day to 5000 m3 / day

The second stage : accommodates about 5000 m3 / day to become 10,000 m3 / day at an estimated cost of three hundred million pounds.

On the land area owned by the company in a manner of purchase by the province of Port Said and estimated at about 10000 m 2

The equipment and machinery will be manufactured by European countries, especially Italy.

Project of Adco Governorate, Al-Buhaira Governorate

The plant will be designed to treat the water 20000 m3 / day produced by the oil sector companies in the area around the station, in particular (BP - Rasheed Company) in addition to serving some of the other neighboring companies in different stations The station will be built in two phases

The first phase : can accommodate about 5000 m3 / day The second phase : accommodates about 5000 m3 / day

The third stage : accommodates about 10,000 m3 / day

At an estimated cost of four hundred million pounds

On the land owned by the company in the manner of purchase by the province of the lake and estimated at 12.600 m 2. In addition to another area of about 3000 m 2, the company plans to buy for the expansion and facilities of the station The equipment and machinery will be manufactured in Europe with the Netherlands.